November 22, 2026 USD 44.93EUR 49.28PLN 11.06
Новини Хмельницький — коротко й по суті
LIVE
Russian strike in Kyiv region: civilian casualties reported in Vyshneve Woman injured in Russian drone attack on Bila Tserkva district in Kyiv region Igor Dodik Nominated as Prime Minister of Republika Srpska Volodymyr Ostapchuk's wife shares her attitude toward his children from the first marriage FC Bukovyna secures a comeback victory against Veres in UPL Matchday 13 Ukrainian Drone Operators' Experience Shapes US Army Training Methods Ukraine and Sweden discuss accelerating Gripen fighter jet deliveries Consequences of an enemy attack in the Kyiv region: casualties reported How Much Water to Drink Daily for Healthy Blood Pressure: Cardiologists Explain Khmelnytskyi Book Restorer: How a 81-Year-Old Master Saved Over 35,000 Library Books Russian strike in Kyiv region: civilian casualties reported in Vyshneve Woman injured in Russian drone attack on Bila Tserkva district in Kyiv region Igor Dodik Nominated as Prime Minister of Republika Srpska Volodymyr Ostapchuk's wife shares her attitude toward his children from the first marriage FC Bukovyna secures a comeback victory against Veres in UPL Matchday 13 Ukrainian Drone Operators' Experience Shapes US Army Training Methods Ukraine and Sweden discuss accelerating Gripen fighter jet deliveries Consequences of an enemy attack in the Kyiv region: casualties reported How Much Water to Drink Daily for Healthy Blood Pressure: Cardiologists Explain Khmelnytskyi Book Restorer: How a 81-Year-Old Master Saved Over 35,000 Library Books

156 million euro hybrid power plant planned for Khmelnytskyi region

💡 Tech 1 min read 👁 0

German company Smart Estate Life SE and Ukraine's Tesla Energo have signed a memorandum to build a 250 MW energy complex featuring solar power and battery storage.

156 million euro hybrid power plant planned for Khmelnytskyi region💡Tech

Photo: ngp-ua

Key points

  • 156 million euro investment
  • 250 MW capacity
  • Energy storage technology

During the ReBuild Ukraine 2026 conference in Warsaw, a significant investment agreement was reached to boost the energy infrastructure of the Khmelnytskyi region. The project involves the construction of a hybrid power plant with a total capacity of 250 MW.

Investment and technological impact

The 156 million euro project will combine solar generation with advanced battery energy storage systems (BESS). This technology ensures that excess energy can be stored and deployed during peak demand or periods of low solar output. The implementation timeline is estimated at two years.

The construction phase is expected to generate approximately 200 temporary jobs, with 20 permanent positions created for the facility's operation. The government agency UkraineInvest is providing organizational support to help the investors navigate regulatory requirements and state support mechanisms.

While the memorandum marks a formal commitment, the project's progression remains subject to final technical approvals and the securing of full financing.

Source ngp-ua — ngp-ua.info/2026/11/92194 ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.